BLAST FURNACE PROCESS EQUIPMENT

Additional infortmation: Director of Ore-Mining and Press-Forging Equipment Production Unit Bobrov Valentin Grigoryevich phone: +38 (0626)47-85-53
Chief Engineer of Ore-Mining and Press-Forging Equipment Production Unit Protynyak Igor Stefanovich phone: +38 (0626)47-88-49
Chief Design Engineer of Ore-Mining and Press-Forging Equipment Production Unit Lavrenko Yuriy Vasilyevich phone: +38 (0626)47-84-50
kgro@nkmz.donetsk.ua
fax: +38 (0626) 47-15-49


  One of the aspects of NKMZ's activities is designing and production of the blast furnace equipment.
  At present, the field experience accumulated at NKMZ enables to supply both individual machines and mechanisms used during the blast furnace retrofitting and complete sets of equipment.
  When designing such machinery, NKMZ cooperates with the research institutes and companies producing the blast furnace process equipment such as PAUL WURT (Luxemburg), VAI (Austria), GYPROMEZ (Russia), etc.
Blast-furnace production