SERVICES OFFERED BY NKMZ ON MINE WINDERS

  To increase rope capacity or reduce deviation angles, the steel lining may be made with a variable winding pitch or with the three friction rope turns being arranged on rubber linings.
  When the brake area is worn out or damaged, the changeable steel lining may be made combined with the brake area.
  Drums which have been jammed may be replaced with the two-section hubs provided with thermally-set pins.
  Brake area grooving device.
  Putting the strap over the drum to align rope lengths.
  Mounting brake blocks made of the moulded material instead of the wooden ones.
  Replacing a single-driven brake with the double-driven one.
  Inserting the tooth-type coupling between drum cases to compensate for the augmented distance between bushes.
  Replacing the uncoupler disk springs with the coil ones.
  Installing the 2-, 3- or 4-rope winders on the newly-made or available foundations with the lift height increased.
  Updating the available machines by modifying them into the multi-rope ground-based machines.